UPPTCL ERP Implementation Project
List of Transaction Codes (T-Codes)
Materials Management
Version 0.1
Document History
Version | Date | Summary of Change | Author | Role |
V 0.1 | 02.04.2022 | Initial Document | Chakshu Garg | MM Consultant |
| 02.04.2022 | Review | Himanshu Rawat | Module Lead |
|
|
|
|
|
|
|
|
|
|
Contents
1. Material Management (MM) 4
1.1 Master Data 4
1.2 PR (Indent) 4
1.2.1 Types of PR’s (Indents) 4
1.3 Request For Quotation 5
1.4 Contract (Work Order) 5
1.4.1 Types of Contracts 5
1.5 Dispatch Instructions 6
1.5.1 Types of Dispatch Instructions 6
1.6 Service Entry Sheet 6
1.7 Goods Receipt Note 6
1.8 Invoice 7
1.9 Reservation 7
1.10 Goods Issue 7
1.11 Physical Inventory Verification 7
1.12 Movement Types in Transaction MIGO 8
1.13 Reports 8
1.14 Print Forms 10
1.15 Inspection Call 10
1.16 Other Important Transactions 11
Material Management (MM)
Material Management module coves Procurement & Inventory. The transaction codes required to execute the main processes in ERP system are placed in subsequent sections:
Master Data
Master data in materials management is the core data that is used as a base for any transaction.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create Material | MM01 |
2 | Change Material | MM02 |
3 | Display Material | MM03 |
4 | Delete Material | MM06 |
5 | Materials List | MM60 |
6 | Create/Change/Display Vendor | BP |
7 | Cerate/Change/Display Service | AC03 |
8 | Service List | AC06 |
PR (Indent)
PR (Indent) is created by respective JE to take material from Store/Workshop.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create Purchase Requisition | ME51N |
2 | Change Purchase Requisition | ME52N |
3 | Display Purchase Requisition | ME53N |
4 | Release Purchase Requisition | ME54N |
5 | Collective Release of Purchase Requisitions | ME55 |
6 | Purchase Requisitions: List Display | ME5A |
7 | Purchase Requisitions for Project | ME5J |
8 | Requisitions by Account Assignment | ME5K |
9 | Print Purchase Requisitions | ZMM_PR_PRINT |
10 | PR Upload Program | ZMM_PR_UPLAOD |
11 | PR Consolidation | ZMM_PR_CONS |
12 | PR Consolidation Report | ZMM_PR_CONS_REP |
13 | PR Pending for Approval | ZMM_PR_PENDING |
Types of PR’s (Indents)
There are multiple PR document types used for different type of transactions.
Sr. No. | Document Type Name | Document Type Code |
1 | Field Indent | ZFLD |
2 | Turnkey Indent | ZTPS |
3 | Standard Indent for Central Procurement | ZIND |
4 | AE Consolidation | ZCAE |
5 | CE Consolidation | ZCCE |
6 | EE Consolidation | ZCEE |
7 | SE Consolidation | ZCSE |
8 | Fin.Cons.Central PR | ZFCR |
9 | Subcontracting PR | ZSBI |
10 | Stock Transfer Indent | ZSTR |
11 | HQ/Zone/Circle PR | ZHPR |
Request For Quotation
Request for quotation is a form of invitation that is sent to vendors to submit quotation indicating pricing and their terms and conditions. Request for quotation can be of two types ZP or ZC. ZP is created as a notice inviting tender and ZC is created for vendors filing tenders.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create Request for Quotation | ME41 |
2 | Change Request for Quotation | ME42 |
3 | Display Request for Quotation | ME43 |
4 | Create Quotation | ME47 |
5 | Display Quotation | ME48 |
6 | Price Comparison List | ME49 |
7 | RFQ’s by Requirement Tracking Number | ME4B |
8 | RFQ’s by Material Group | ME4C |
9 | RFQ’s by Supplier | ME4L |
10 | RFQ’s by Material | ME4M |
11 | RFQ’s by RFQ Number | ME4N |
12 | RFQ’s by Collective Number | ME4S |
|
|
|
Contract (Work Order)
Contract is created once any LOI/LOA is placed to any vendor by any dept. Contract is equivalent to work order in business language.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create Contract | ME31K |
2 | Change Contract Change | ME32K |
3 | Display Contract Display | ME33K |
4 | Outline Agreements for Requirement Number | ME3B |
5 | Outline Agreements for Material Group | ME3C |
6 | Outline Agreements for Project | ME3J |
7 | Outline Agreements for Account Assignment | ME3K |
8 | Outline Agreements per Supplier | ME3L |
9 | Outline Agreements by Material | ME3M |
10 | Outline Agreements by Agreement Number | ME3N |
11 | Contract Print | ZMM_CON_PRINT |
12 | Contract Closure Certificate | ZMM_CON_COMPL |
13 | Allotment Letter | ZMM_ALLOT |
Types of Contracts
There are multiple Contract document types used for different types of procurements.
Sr. No. | Document Type Name | Document Type Code |
1 | Field Contract | ZFPO |
2 | Turnkey Contract | ZTPO |
3 | Central Contract | ZCPO |
Dispatch Instructions
Once a contract is created, dept. issues DI to vendor to deliver the material/services at respective Stores.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create DI | ME21N |
2 | Change DI | ME22N |
3 | Display DI | ME23N |
4 | PO’s by Requirement Tracking Number | ME2B |
5 | Purchase Orders by Material Group | ME2C |
6 | Purchase Orders for Project | ME2J |
7 | Purchase Orders by Account Assignment | ME2K |
8 | Purchase Orders by Supplier | ME2L |
9 | Purchase Orders by Material | ME2M |
10 | Purchase Orders by PO Number | ME2N |
11 | Services per Purchase Order | ME2S |
12 | Purchase Orders for Supplying Plant | ME2W |
13 | Material DI Print | ZMM_M_DI_PRINT |
14 | Service PO Print | ZMM_S_PO_PRINT |
Types of Dispatch Instructions
There are multiple dispatch instruction document types used for different types of procurements.
Sr. No. | Document Type Name | Document Type Code |
1 | Field DI | ZFDI |
2 | Turnkey DI | ZTDI |
3 | Central DI | ZCDI |
4 | Stock Transport Order | ZSTO |
5 | Returns Order | ZRPO |
6 | Miscellaneous Order | ZMDI |
7 | Subcontracting order | ZSDI |
Service Entry Sheet
Service Entry Sheet is done for services. Based on this only, invoices are initiated for parking in Finance system.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Service Entry Sheet Create/Change/Display/Release | ML81N |
2 | List of Service Entry Sheets | ML84 |
3 | Collective Release of Entry Sheets | ML85 |
Goods Receipt Note
Once material reaches the respective store, goods receipt against the DI issued by dept. is done.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Goods Receipt Create/Change/Display | MIGO |
2 | Goods Receipt Print | ZMM_GR_PRINT |
Invoice
Parking of invoice is done after having received the goods from the vendor.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Display Invoice | MIR4 |
2 | Invoice Overview | MIR6 |
3 | Park Invoice | MIR7 |
4 | Display List of GR/IR Balances | MB5S |
Reservation
Reservation is a request to the warehouse to keep materials ready for a goods issue at a later date (for future use) and for a certain purpose. A Reservation for goods Issue can be requested by various departments by various account assignment objects (such as cost center, order, assets).
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create Reservation | MB21 |
2 | Change Reservation | MB22 |
3 | Display Reservation | MB23 |
4 | Reservation List | MB25 |
5 | Approve Reservation | ZMM_RES_APP |
6 | Print Reservation | ZMM_RES_PRINT |
Goods Issue
Goods issue is done for consumption of stock from store/warehouse.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Goods Issue Create/Change/Display | MIGO |
2 | Goods Issue Print | ZMM_GI_PRINT |
3 | STO Goods Issue Print | ZMM_STO_GI_PRINT |
Physical Inventory Verification
Physical inventory verification is conducted by Stores on a certain frequency to check the actual inventory available vs available in ERP system.
Sr. No. | Activity | Transaction Code (T-Code) |
1 | Create Physical Inventory Document | MI01 |
2 | Change Physical Inventory Document | MI02 |
3 | Display Physical Inventory Document | MI03 |
4 | Enter Inventory Count with Document | MI04 |
5 | Change Inventory Count | MI05 |
6 | Display Inventory Count | MI06 |
7 | Post Physical Inventory Difference | MI07 |
8 | Recount Physical Inventory | MI11 |
9 | Print List of Differences | MI20 |
10 | Print Physical Inventory Document | MI21 |
11 | Display Physical Inventory Documents for Material | MI22 |
12 | Display Physical Inventory Data for Material | MI23 |
13 | Physical Inventory List | MI24 |
14 | Workflow for Write-Off | ZMM_PI_APPR |
Movement Types in Transaction MIGO
Sr. No. | Activity | Movement Type | Description |
| Goods Receipts | 101 | Goods receipt for purchase order into warehouse/stores |
| Goods Receipt | 901 | Receipt w/o purchase order into unrestricted-use stock |
| Goods Issue | 201 | Consumption for cost center from warehouse |
| Goods Issue | 221 | Consumption for project from warehouse |
| Goods Issue | 241 | Consumption for asset from warehouse |
| Goods Issue | 261 | Consumption for order from warehouse |
| Goods Issue | 351 | Transfer posting to stock in transit from unrestricted-use |
| Goods Issue | 543 | Consumption from subcontracting stock |
| Goods Issue | 601 | Goods issue for delivery |
| Goods Issue | 951 | Withdrawal for scrapping from unrestricted-use stock |
| Goods Issue | 952 | Withdrawal for scrapping from unrestricted-use stock - reversal |
| Transfer Posting | 541 | Transfer of unrestricted-use stock to subcontracting stock |
| Transfer Posting | 911 | Transfer posting to change valuation type |
| Transfer Posting | 913 | Transfer posting storage location to storage location |
| Transfer Posting | 9V3 | Transfer posting storage location to vendor location – remove from storage |
| Transfer Posting | 9V5 | Transfer posting storage location to vendor location – place in storage |
| Returns | 161 | Returns for Purchase Order |
| Posting Inventory Difference | 701 | Transfer if physical stock is greater than Books stock in case of unrestricted stock |
| Posting Inventory Difference | 702 | Transfer if physical stock is less than Books stock in case of unrestricted stock |
| Transfer Posting | 411 | Moving of stock from Capital to O&M. |
| Transfer Posting | 412 | Moving of stock from O&M to Capital. |
Reports
Sr. No. | T code | Description |
1 | MB52 | List of Warehouse Stocks on Hand |
2 | MB53 | Display Plant Stock Availability |
3 | MB5B | Stocks for Posting Date |
4 | MB5L | List of Stock Values: Balances |
5 | MB5T | Stock in transit CC |
6 | MB5W | List of Stock Values |
7 | MBBS | Display Valuated Special Stock |
8 | MBGR | Display Material Docs. by Movement Reason |
9 | MBSM | Display Cancelled Material Docs. |
10 | ME2B | POs by Requirement Tracking Number |
11 | ME2C | Purchase Orders by Material Group |
12 | ME2J | Purchase Orders for Project |
13 | ME2K | Purch. Orders by Account Assignment |
14 | ME2L | Purchase Orders by Supplier |
15 | ME2M | Purchase Orders by Material |
16 | ME2N | Purchase Orders by PO Number |
17 | ME2O | SC Stock Monitoring (Supplier) |
18 | ME2S | Services per Purchase Order |
19 | ME2W | Purchase Orders for Supplying Plant |
20 | ME3B | Outline Agreements for Requirement No. |
21 | ME3C | Outline Agreements for Material Grp |
22 | ME3J | Outline Agreements for Project |
23 | ME3K | Outline Agreements for Account Assignment |
24 | ME3L | Outline Agreements per Supplier |
25 | ME3M | Outline Agreements by Material |
26 | ME3N | Outline Agreements by Agreement No. |
27 | ME4B | RFQs by Requirement Tracking Number |
28 | ME4C | RFQs by Material Group |
29 | ME4L | RFQs by Supplier |
30 | ME4M | RFQs by Material |
31 | ME4N | RFQs by RFQ Number |
32 | ME4S | RFQs by Collective Number |
33 | ME5A | Purchase Requisitions: List Display |
34 | ME5J | Purchase Requisitions for Project |
35 | ME5K | Requisitions by Account Assignment |
36 | ME80FN | General Analyses (F) of Purchase document |
37 | MKVZ | List of Suppliers: Purchasing |
38 | ML84 | List of Service Entry Sheets |
39 | MM60 | Materials List |
40 | MMBE | Stock Overview |
41 | MR51 | Accounting Documents for Material Docs |
42 | MSRV2 | Service List for Requisition |
43 | MSRV4 | Service List for RFQ |
44 | MSRV5 | Service List for Contract |
45 | MSRV6 | Service List for Entry Sheet |
46 | ZMM_MB5B | Stocks for Posting Date-Enhanced |
47 | ZMM_MSTC_UPLOAD | MSTC Report |
48 | ZMM_TEN_TRACK | Tender Tracking Dashboard |
49 | MB51 | Material Document List |
50 | S_P00_07000139 | Stock Card and Inventory Material Report |
51 | J3RFLVMOBVEDH | Stock Overview |
52 | MC$0 | Purchase Analysis by Purchase Group |
53 | MC$G | Purchase Analysis by Material |
54 | MC$0 | Purchase Analysis by Vendor |
55 | MC$< | Purchase Analysis by Material Gorup |
56 | MSRV3 | Service List for Purchase Order |
57 | ME6H | Standard Analysis : Supplier Evaluation |
Print Forms
Sr. No. | T-Code | Description |
1 | ZMM_PR_PRINT | Purchase Requisition Print |
2 | ZMM_CON_PRINT | Contract Print |
3 | ZMM_M_DI_PRINT | Material DI Print |
4 | ZMM_S_PO_PRINT | Service PO Print |
5 | ZMM_GATE_PRINT | Gate Pass Print |
6 | ZMM_GT_PRINT | Gate Entry Print |
7 | ZMM_GR_PRINT | Goods Receipt Print |
8 | ZMM_GI_PRINT | Goods Issue Print |
9 | ZMM_STO_PRINT | Stock Transfer Order Print |
10 | ZMM_STO_GI_PRINT | STO Goods Issue Print |
11 | ZMM_RES_PRINT | Reservation Print |
Inspection Call
Sr. No. | T-Code | Description |
1 | QI01 | Q-Info Record Creation |
2 | QI02 | Q-Info Record Change |
3 | QI03 | Q-Info Record Display |
4 | QA01 | Create Inspection lot |
5 | QA02 | Change Inspection lot |
6 | QA03 | Display Inspection lot |
7 | ZQM_Plant | Maintained Plant Code |
8 | ZQM_INSPECTOR | Maintain user Id for Inspector |
9 | ZQM_MANUFAC | Maintain Manufacturer details |
10 | ZQIC1 | Inspection Call Creation |
11 | ZQIC2 | Inspection Call Change |
12 | ZQIC3 | Inspection Call Display |
13 | ZQICP | Source Inspection Planning |
14 | ZQICD | Inspection Call UD |
Other Important Transactions
Sr. No. | T-Code | Description |
1 | ZMM_GE | Gate Entry Create / Change / Display / Print / Report |
2 | ZMM_GP | Gate Pass Create / Change / Display / Print / Report |
3 | ZMM_PV | Price Variance |
4 | ZMM_PVC | Price Variance Calculator |
5 | ZMM_SCRAP | Maintain Scrap Division-Wise |
6 | CL03 | Display Class |
7 | MEK3 | Display Conditions (Purchasing) |
Comments
Post a Comment