PM_Transaction_Codes

 







                           

        Project SARTHI



              UPPTCL ERP Implementation Project

                  List of Transaction Codes (T-Codes)

   PLANT MAINTENANCE

           Version 0.1













Document History


Version

Date

Summary of Change

Author

Role

V 0.1

02.04.2022

Initial Document

Avinash Kumar Dwivedi

PM Consultant


02.04.2022

Review

Satya Mahapatra

Module Lead











Table of Contents

1.1     Master Data 4

1.1.1  Work center 4

1.1.2 Functional location 4

1.1.3 Equipment 4

1.1.4 Class & characteristics 4

1.1.5 Tasklist 5

1.1.6 Measuring point 5

1.1.7 Measuring point and Counter 5

1.1.8 Last Measuring Value and Max-Min Measuring value 5

1.1.9 Linear reference pattern 5

2.1 Maintenance Process 6

2.1.1 General Maintenance 6

2.1.2 Breakdown Maintenance 6

2.1.3 Shutdown Maintenance 7

2.1.4 Preventive Maintenance 7

2.1.5 Tripping Process 8

2.1.6 Refurbishment Maintenance 8

2.1.7 Calibration Maintenance Process 8

3.1 Custom Report 9






















  1. Master Data


Plant Maintenance is a module of SAP ERP which is used for effective planning and execution of Maintenance work across the organization. Following are the list of T-codes for managing PM Master data and Business processes.


   1.1.1     Work center

          

Sr. No.

Activity

Transaction Code (T-Code)

1

Create work center

IR01

2

Change work center

IR02

3

Display work center

IR03

4

Work center List

CR05




  1. Functional location


Sr. No.

Activity

Transaction Code (T-Code)

1

Create functional location

IL01

2

Change functional location

IL02

3

Display functional location

IL03

4

Functional location structure

IH01

5

Display functional location report

IH11

6

Functional location display

IH06



1.1.3 Equipment


Sr. No.

Activity

Transaction Code (T-Code)

1

Create equipment

IE01

2

Change equipment

IE02

3

Display equipment

IE02

4

Display equipment report

IH10

          

1.1.4   Class & characteristics

           

Sr. No.

Activity

Transaction Code (T-Code)

1.

Create Characteristics

CT04

2.

Change Characteristics

CT04

3.

Display Characteristics

CT04

4.

Create class

CL02

5.

Change class

CL02

6.

Display class

CL02

  7.

Assign Characteristics to Class

CL02





1.1.5 Tasklist

       

Sr. No.

Activity

Transaction Code (T-Code)

1

Create General Tasklist

IA05

2

Change General Tasklist

IA06

3

Display General Tasklist

IA07

4

Create Functional Location Tasklist

IA11

5

Change Functional Location Tasklist

IA12

6

Display Functional Location Tasklist

IA13

7

Display Tasklist report

IA39


1.1.6 Measuring point

          

Sr. No.

Activity

Transaction Code (T-Code)

1

Create measuring point

IK01

2

Change measuring point

IK02

3

Display measuring point

IK03

4

Create measuring document

IK11

5

Change measuring document

IK12

6

Display measuring document

IK13

8

Display measuring document report

IK17

9

Change measuring document report

IK18

10

Measurement document interval

IK19


1.1.7 Measuring point and Counter 


Sr. No.

Activity

Transaction Code (T-Code)

1.

For measuring point reading upload

ZPM4009

2.

For counter reading upload

ZPM4002


1.1.8 Last Measuring Value and Max-Min Measuring value 


Sr. No.

Activity

Transaction Code (T-Code)

1.

For Last Measuring value

ZPM_LAST_MEASVAL

2.

For maximum-minimum measuring Value 

ZPM_MAXMIN_MEASVAL


 1.1.9    Linear reference pattern

        

Sr. No.

Activity

Transaction Code (T-Code)

1

Create linear reference pattern

IK81

2

Change linear reference pattern 

IK82

3

Display linear reference pattern 

IK83


          



1.1.10    Maintenance plan

           

Sr. No.

Activity

Transaction Code (T-Code)

1

Create maintenance plan

IP41

2

Change maintenance plan

IP02

3

Display maintenance plan

IP03

4

Schedule maintenance plan

  IP10

5

Scheduling overview list

IP24

6

Mass Schedule Maintenance plan

IP30H

 

  1.  Maintenance Process


2.1.1 General Maintenance


            General Maintenance is a planned process of doing maintenance that is resulted from regular inspection, day-to-day maintenance activity on an equipment or Functional Location to minimize breakdown. 


Sr. No.

Activity

Transaction Code (T-Code)

1

Create Notification

  IW21

2

Change Notification 

IW22/IW28

3

Display Notification

IW23/IW29

4

Create Work Order

IW34

5

Change Work Order

IW32/IW38

6

Display Order

IW33/IW39

7

PM Order Material issue slip

ZPM_MAT_ISSUE

8

  Issue material 

MIGO

9

  Time confirmation

IW41/IW42

10

  Cancel PM order Confirmation (If required)

IW45

11

Technical completion

IW32/IW38

12

Close Notification

IW22



  1. Breakdown Maintenance


Breakdown maintenance activities are undertaken after the failure of element or line stopped working those results in an outage of circuit or supply, which attracts immediate maintenance to restore the service to the operating condition.


Sr. No.

Activity 

Transaction Code

1

Create Notification

  IW21

2

Change Notification 

IW22/IW28

3

Display Notification

IW23/IW29

4

Create Work Order

IW34

5

Change Work Order

IW32/IW38

6

  Display Order

IW33/IW39

7

  PM Order Material issue slip

ZPM_MAT_ISSUE

8

  Issue material 

MIGO

9

  Time confirmation

IW41/IW42

10

  Cancel PM order Confirmation (If required)

IW45

11

  Technical completion

IW32/IW38

12

  Close Notification

IW22







  1. Shutdown Maintenance

Shutdown maintenance is one of the critical process which aims to overhaul the Equipment or Functional location to prevent future un-planned down time and to maintain the reliability of the asset


Sr. No.

Document Type Name

Document Type Code

1

Create Notification

  IW21

2

Change Notification 

IW22/IW28

3

Display Notification

IW23/IW29

4

Approval Dashboard (ALDC/SLDC/OCC)

ZPM_IW28

5

Create Revision

IWR1

6

Create Work Order

IW34

7

Change Work Order

IW32/IW38

8

  Create Permit to Work

IW32/WCTK

9

  Change Permit to Work

IW32/WCTL/WCLO

10

  Display Permit to Work

IW32/WCTM

11

  Create Isolation Lists & safety Precaution

IW32/ WCR3

12

  Change Isolation Lists & safety Precaution

IW32/ WCT7

13

  Display Isolation Lists & safety Precaution

IW32/ WCT8

14

  Display Order

IW33/IW39

15

  PM Order Material issue slip

ZPM_MAT_ISSUE

16

  Print Purchase Requisitions

ZMM_PR_PRINT

17

  Issue material 

MIGO

18

  Purchase Order Creation (in case of Ext. Service)

ME21N

19

  Time confirmation

IW41/IW42

20

  Cancel PM order Confirmation

IW45

21

  Close Permit to Work

IW32/WCTL/WCLO

22

  Service Entry Sheet

ML81N

23

  Technical completion

IW32/IW38

24

  Close Notification

IW22



  1. Preventive Maintenance


Preventive maintenance (PM) is the regular and routine maintenance of equipment and assets in order to keep them running and prevent any costly unplanned downtime from unexpected equipment failure.


Sr. No.

Activity

Transaction Code (T-Code)

1

Create Tasklist

IA05/IA11

2

Change Tasklist

IA06/IA12

3

Display Tasklist

IA07/IA13

4

Create Maintenance plan

IP41/IP01

5

Change Maintenance plan

IP02

6

Display Maintenance plan

IP03

7

Schedule Maintenance Plan

IP10/IP30H

8

Change Work Order

IW32/IW38

9

  Display Order

IW33/IW39

10

PM Order Material issue slip

ZPM_MAT_ISSUE

11

Issue material

MIGO

12

Purchase Order Creation

ME21N

13

Time confirmation

IW41/IW42

14

Cancel PM order Confirmation

IW45

15

Technical completion

IW32/IW38







  1. Tripping Process


If tripping occurred at sub-station, the operator inspects in the yard to find the potential reason for tripping. In case it happens in the transmission line, the line patrolling team inspects the actual fault and finds the reason. If the transient fault is found in both the cases, then maintenance team attends the call to rectify the fault. Subsequently, an attempt is to be made to charge the line/element to restore the supply. 


Sr. No.

Activity

Transaction Code (T-Code)

1

Create Notification

IW21

2

Change Notification 

IW22/IW28

3

Display Notification

IW23/IW29



2.1.6 Refurbishment Maintenance


Refurbishment is defined as the process of repairing spare parts and returning the spare parts to the warehouse or to the equipment. You can define a Refurbishment order as Maintenance order by which you can execute the process of refurbishing damaged material / equipment.


Sr. No.

Activity

Transaction Code (T-Code)

1

Create Work Order

IW81/IW31

2

Change Work Order

IW32/IW38

3

Display Work Order

IW33/IW39

4

PM Order Material issue slip

ZPM_MAT_ISSUE

6

Issue material

MIGO

7

Purchase Order Creation

ME21N

8

Subcontracting process

ADSUBCON

9

Goods Receipt

IW8W

10

Time confirmation

IW41/IW42

11

Technical completion

  IW32/IW38



  1. Calibration Maintenance Process


Calibration Process will be performed on equipment and Standard Master Equipment. Following cases will be included in this

Calibration of measuring or control equipment (Scheduled)

Calibration and certification for Standard equipment (Master Calibrator) as per schedule


Sr. No.

Activity

Transaction Code (T-Code)

1

Create Master Inspection Characteristics

QS21

2

Create Calibration Maintenance Tasklist

IA05

3

Maintenance plan

IP41

4

Schedule plan

IP10

5

Change work Order 

IW32

6

Result Recording against Inspection lot

QE51N/QE17

7

Usage Decision

QA11

8

Time confirmation

IW41/IW42

9

Technical completion

IW32/IW38


3.1 Custom Report


Sr. No.

Activity

Transaction Code (T-Code)


Shift Logbook

ZPM_LOGBOOK


Sketch Book Report

ZPM_SBR


BST Report (Tripping Shutdown Breakdown Report)

ZPM_BST_REPORT


Comments