AC requirement as per recommendation
|
AC requirement as per recommendation of Committee
formed by Order No. 1727/Director (Op)/Committee Dated 09.04.2024 for
132/33kV AIS substation |
||||||||
|
S.No. |
Description |
Nos |
Length (M) |
Breadth (M) |
Height (M) |
Volume (Cum) |
Tonnage Req. (TR) |
No. of 2 Ton AC Required |
|
1 |
Control Room |
1 |
18 |
8.5 |
3 |
459 |
18.84 |
10 |
|
2 |
Panel Room |
1 |
4.5 |
4 |
3 |
54 |
2.22 |
2 |
|
3 |
JE Room |
1 |
5 |
3 |
3 |
45 |
2 |
1 |
|
4 |
AE Room |
1 |
5 |
3 |
3 |
45 |
2 |
1 |
|
|
Subtotal (132/33 KV) |
|
|
|
|
|
25.06 |
14 |
|
AC requirement as per recommendation of Committee
formed by Order No. 1727/Director (Op)/Committee Dated 09.04.2024 for
220/132/33kV AIS substation |
||||||||
|
5 |
Control Room |
1 |
25.48 |
8 |
3 |
611.52 |
25.1 |
13 |
|
6 |
AE Room |
2 |
4.53 |
3.73 |
3 |
101.38 |
4 |
2 |
|
7 |
JE Room |
1 |
4.03 |
2.86 |
3 |
34.58 |
2 |
1 |
|
8 |
Relay Panel Room |
1 |
9.63 |
6.62 |
3 |
191.25 |
7.08 |
4 |
|
9 |
Carrier Room |
1 |
7.23 |
4.06 |
3 |
88.06 |
3.61 |
2 |
|
|
Subtotal (220/132/33 KV) |
|
|
|
|
|
41.79 |
22 |
|
Notes: |
||||||||
|
Tonnage
requirement for Panel Room is @ 1 TR per 24.35 Cum. |
||||||||
|
Tonnage
requirement for other rooms is @ 1 TR per 27.00 Cum |
||||||||