AC requirement as per recommendation

 

AC requirement as per recommendation of Committee formed by Order No. 1727/Director (Op)/Committee Dated 09.04.2024 for 132/33kV AIS substation

S.No.

Description

Nos

Length (M)

Breadth (M)

Height (M)

Volume (Cum)

Tonnage Req. (TR)

No. of 2 Ton AC Required

1

Control Room

1

18

8.5

3

459

18.84

10

2

Panel Room

1

4.5

4

3

54

2.22

2

3

JE Room

1

5

3

3

45

2

1

4

AE Room

1

5

3

3

45

2

1

 

Subtotal (132/33 KV)

 

 

 

 

 

25.06

14

AC requirement as per recommendation of Committee formed by Order No. 1727/Director (Op)/Committee Dated 09.04.2024 for 220/132/33kV AIS substation

5

Control Room

1

25.48

8

3

611.52

25.1

13

6

AE Room

2

4.53

3.73

3

101.38

4

2

7

JE Room

1

4.03

2.86

3

34.58

2

1

8

Relay Panel Room

1

9.63

6.62

3

191.25

7.08

4

9

Carrier Room

1

7.23

4.06

3

88.06

3.61

2

 

Subtotal (220/132/33 KV)

 

 

 

 

 

41.79

22

Notes:

Tonnage requirement for Panel Room is @ 1 TR per 24.35 Cum.

Tonnage requirement for other rooms is @ 1 TR per 27.00 Cum

Comments

Popular posts from this blog

Power Flow Diagram in Bijnor District